Project Progress

Progresso Total do Projeto

22%
 

Actions A – Preperatory actions

A1

Preparatory operational plannig for conservation works

78%

A2

Setting-up of an integrated WebGIS Azores N2000 terrestrial databate

33%

A3

Setting-up  of an integrated WebGIs Azores N2000 marine database

33%

A4.1

Terrestrial N2000 sites, areas, species and habitats

0%

A4.2

Marine N2000 sites, areas, species and habitats

0%

A4.3

PAF revision

0%
Ver mais sobre as ações A aqui
 

Ações C – Conservação

C1

Purchase of privately owned land for the subsequent restoration of natural habitats and protected species

67%

C2.1

Internal capacity building

20%

C2.2

External capacity building

9%

C3.1

Ex-situ conservation

50%

C3.2

In-situ conservation

25%

C4.1

Best practice for terrestrial habitat conservation

50%

C4.2

Pilot for ecological corridor implementation

50%

C4.3

Restoration of water streams in Macaronesian habitat

25%

C5

Implementation of integrated conservation works of priority habitat for Pyrrhula murina conservation

25%

C6.1

Restoration islet Seabirds habitat

20%

C6.2

Low cost monitoring system for seabirds in remote colonies

0%

C7

Assessing distribution and conservation needs for Nyctalus azoreum (Azores bat)

0%

C8.1

Control and erradication of IAS plant species in terrestrial restored habitat

40%

C8.2

Control and erradication of IAS animal species in terrestrial restored habitat

20%

C9

Restoring coastal and marine species

0%

C10.1

Minimizing marine litter impact in marine coastal habitat

0%

C10.2

Coastal habitat management

0%

C10.3

Ensuring Offshore Marine N2000 ecological representatives

0%

C11

Design, Essay and Evaluation of pilot island prevention, early warning and rapid response operational frameworks for IAS

17%

C12

Implementation of a Regional Strategy for prevention and control of marine IAS

7%

C13.1

EARDF FUNDS advisory for farmers

0%

C13.2

Minimizing agriculture negative impacts in N2000

0%

C14.1

Integrated assessment and mitigation of tourism negative impacts of N2000 Azores Nature Trails

0%

C14.2

Minimizing touristic impact of Pico da Vara trail

0%

C14.3

Minimizinf Whale-watching and diving activities negative impacts in N2000

50%

C15.1

EMFF Funds advisory for fisheries and miritime affairs

25%

C15.2

Regulation of Lobster exploitation

0%

C16

N2000 policies integration with marine transport

0%
Ver mais sobre as ações C aqui
 

Ações D – Monitorização

D1

Monitoring the projects impact on LIFE IP Performance Indicatiors

40%

D2

Monitoring the projects contribution to the implementation of the PAF

66,6

D3

Monitoring the projects socio-economic impact

25%

D4

Monitoring the projects effects on ecosystem services

40%

D5.1

Monitoring of concrete results on habitats, species and conservation problems

40%

D5.2

Monitoring of marine habitats, species and conservation problems

0%
Ver mais sobre as ações D aqui
 

Ações E – Comunicação e Disseminação

E1

Project communication plan

56%

E2

Dissemination, transferability and replicability of project innovative/demonstration actions

14%

E3

Networking with other LIFE and/or non-LIFE projects

40%

E4

Environmental Education program

30%

E5

Public engagement and volunteering program

100%
Ver mais sobre as ações E aqui
 

Ações F – Gestão do projeto

F1

Overall project management

24%

F2

Regular delivery of phase/planning and monitoring of project progress

25%

F3

Complementary funds

25%

F4

Stakeholder and Advisory board

25%

F5

After-LIFE plan

0%

The LIFE IP AZORES NATURA (LIFE17 IPE/PT/000010) project has received funding from the LIFE Programme of the European Union.
The exclusive responsibility for the content of this website belongs to the authors and does not necessarily reflect the view of the European Union.
Neither CINEA nor the European Commission are responsible for any use that may be made of the information contained therein.